Civil and industrial construction projects
Industrial constructions - Millenium Logistic Park, Bucharest South
MLP BUCHAREST SOUTH, Depositing hall and office building
On going (80%).
Infrastructure: Isolated concrete foundations for the two main buildings, blocks and foundations for secundary structures (closing pillons and fire proof walls), with a suface of 2.40 m x 3.00 m (BxL);
The suprastructure is made of: For the main building, concrete prefabricated pillons and metal frames. For the secondary building, the whole structure is made of prefabricated concrete, in transversal and longitudinal frame system; The metall coverings are from bow metal, thermoisolated, and waterisolated on the roofs.
The project has an execution period of: 10 months
First phase – 12500 mp infrastructure, suprastructure, interior and exterior finishing.
Projects
News
- 08/10/2010
- Eren in the charts of Brasov Business Awards
- 04/10/2010
- EREN sponsored Transylvanian Grand Prix 2010
- 13/09/2010
- Eren Cons obtained the certificate for Social Responsability Management
- 07/07/2010
- 5 years of Industrial Construction activities of Eren
- 23/04/2010
- Successfull ISO survaillance audit for Eren
